Great Orme Tramway 4.7.26

July 16, 2026  •  Leave a Comment

The Great Orme Tramway in Llandudno is Britain's last street cable tramway and one of only a few left in the world.

 
The Great Orme is a limestone headland on the north coast of Wales, north-west of the town of Llandudno which at it's summit is 207 metres tall and has some steep slopes.
 
The authority was given to build a tramway via the 1898 Great Orme Tramways act from near the foot of the Great Orme through to the summit.  The original purpose of the Tramway was to transport passengers, goods and parcels up and down the Great Orme.
 
Given the steep gradient of the slopes, it was decided operate the tramway using cable haulage and over two sections:
 
The Lower Section
 
Constructed: 1901
Opened: 31st July 1902
Length: 872 yards
Gauge: 3ft 6inches
Operated by: Cars 4 and 5
 
Construction work commenced in 1901 on the lower section, with this section opened on 31st July 1902 with the first passengers seen off by the town band playing 'God Save the King'.  The track was laid to a gauge of 3ft 6in and had a conduit slot in the centre, under which there was the wires and pulleys used to haul the trams up and down the slope.
 
Originally the line began in the yard of the Victoria Hotel, which required a sharp turn onto Old Road.   Within a couple of years, Victoria Station was built on the corner of Church Walks and Old Street with the Victoria Hotel being demolished, allowing for a straighter descent into the terminus.  
 
The first half of the lower line is single tracked and tackles the steep ascent (a gradient of between 1 in 4.4 and 1 in 3.6) up Old Road past the Kings Head pub and via a few twists and turns up towards the junction of Ty-Gwyn Road, where the first, now closed request stop, Black Gate was located.  Old Road this first stretch is so narrow that only local residents can use it during operational hours and general traffic at other times.  
 
After the line crosses the junction at Ty-Gwyn Road, controlled by traffic lights and light rail signals, the road widens and the gradient gets steeper as the tramway comes off the road onto its own reservation to the side of the road.   Shortly after there is a loop to allow both trams to pass each other. at the end of the loop, the tracks are interlaced to allow the wires and pulleys for both trams to stay apart from each other for the remaining journey up hill. The gradient steepens again as Ty-Gwyn Road rounds a sharp bend, which on the decent offers a fantastic view over the promenade in Llandudno and was the location for the second former request stop, Killen's Hill and shortly after as the line passes the junction with St Beuno's Road, the edge of town is reached and the final stretch of this section is surrounded by countryside before reaching Halfway Station, the terminus for this section of the line, 872 track yards from Victoria Station.  
 
Once reached, passengers walk from the lower station, through a long corridor with views of the interior of the lower maintenance shed, the power house and the upper maintenance shed, ready to get onto the next tram in the upper section up to the summit.  Originally passengers had to walk around the outside of the sheds and power house until a depot / powerhouse building was built in the early 2000s.
 
The Power House.
 
The Power House which provides power to the winding mechanisms which haul the trams up and down both sections of the line, is located at the halfway point of the line. Originally powered by coke burners producing steam, the winching system is now powered by electricity.  The winching system lowers one tram down the hillside and the other one up at the same time, with a separate system for each section of the line.  Each section is controlled by a winchman, who operates the winches, starts and stops the trams, controls the speed of the cable and can stop the system or trams in an emergency.
 
The winchmen are assisted by attendants on each car, who are in communication with the winchmen using an induction-loop radio system. Originally, messages were passed using an overhead wire telegraph and trolley poles on the tram cars, this system was phased out in the early 1990s and the overhead wire has since been removed, but the cars still carry the trolley poles and many of the overhead poles to support the wires are still in existence.
The Upper Section
 
Constructed: 1901
Opened: 8th July 1903
Length: 827 yards
Gauge: 3ft 6in
Operated by: Cars 6 & 7
 
The completion of the upper section was delayed and occurred almost a year after the lower section opened.   The upper section opened with no fanfare on the 8th July 1903.  The main difference between both sections was that the upper section was more of a tramroad with ballasted sleeper track with the pulleys and cables out in the open.
 
Starting from Halfway, the single track line follows near to Ty-Gwyn Road as it makes its way up to the summit and crosses over St Tudno's Road.   The gradient on the upper section is not as steep (Gradients of around 1 in 10.3 and averaging around 1 in 15.5) as the lower section and the halfway point of the upper section is marked with a passing loop.   Unlike the lower section, the line returns to a single line after the loop, this is possible because the cable grips are fitted at the opposite sides of each tram car on this section to allow the cable to be kept apart.  
 
After the passing loop, the line goes into a curved cutting.  Once out of the cutting, Bishop's Quarry is to the left and ahead, 827 yards from Halfway station is the summit building and station.   
 
The view from the top is amazing! You can see out across Wales and on a clear day as far as Ireland, the Isle of Man, the Lake District and Blackpool.
 
The Tram Cars
 
A fleet of tramcars were built to operate the service on both the upper and lower sections of the line.
 
Passenger fleet
Numbers: 4 - 7
Built: 1902
Builder: Hurst Nelson (Motherwell)
Gauge: 3 feet 6 inches
Length: 37 feet
Haulage type: cable
 
The four passenger tramcars were built by Hurst Nelson of Motherwell in 1902, with cars 4 and 5 being delivered first for the opening of the lower section in 1902.   Cars 6 & 7 arrived later for use on the upper section, which opened in 1903.   All four cars have operated on the same sections for the entirety of their working lives on the tramway.
 
All four cars are wooden bodied bogie trams with driving platforms at either end.   The trams have no glass in their windows to allow for a better view (and a full experience of the Welsh weather!). The interiors are quite spartan with wooden slatted seating in banks of 4 for 48 people.   There is a partition with doors between the driving platforms and the passenger saloons.
 
The driving platforms are also the entrance and exit from the cars for the passengers and each contain: 
  • a pair of brake handles

  • a pedal to work the horn

  • a dead man's pedal

  • a series of controls to allow communication with the Power House and Winchman.  

  • The lower section cars are also fitted with water tanks to allow the driver to spray water onto the track in certain conditions.  

 
The only external differences between the cars is that the lower section cars have lifeguards on their bodysides at wheel level, whilst the upper cars don't.  
All four cars retain their trolley poles, which were used to connect to the old telegraph system, which was superseded in the 1990s. Although they remain, they are no longer used and are tied down onto the roof of the cars.
 
All four cars wear a deep blue livery with cream decorative scroll work in the lower parts with cream window frames and black iron work and are named after local saints: St Tudno (car 4), St Silio (car 5), St Seiriol (car 6) and St Trillo (car 7).
 
Freight Cars
 
Numbers: 1 - 3
Built: 1902
Withdrawn / scrapped by: 1911
Builder: Hurst Nelson (Motherwell)
Gauge: 3 feet 6 inches
Length: 16 feet
Haulage type: cable
 
The original bill for the creation of the line stated that it had to be used for passenger, parcel and freight duties, therefore a fleet of freight cars were also required.   Three freight cars were delivered for this purpose.  
 
The freight cars had a wide variety of uses from transporting parcels and goods to locals staying along the route in the street section or to the facilities at the summit, delivering coke / coal to allow the Power House to operate and even deliver coffins for burial at St Tudno's Church Yard! There was a fee for the coffin to be carried in the freight car and also for the mourners to be transported in the regular passenger car.
 
The freight wagons could be hauled either on their own (replacing a passenger car) or pushed / hauled up and down by a passenger car.  At Halfway, there was a pair of loops round either side of the building to allow the freight cars to be manhandled between sections if needed, as well as a storage siding.
 
The freight operation did not last long after the opening of the line, one of the vehicles was converted to a coal wagon to service the Power House, however the coal was soon been delivered by road and there was no longer a need for the tramway to carry any freight traffic with all three freight cars having been withdrawn and scrapped by 1911.
 
Fleet list
 

Number

Name

Built

Type

In Service

Section

Photo

1

N/A

1902

Freight

Withdrawn/Scrapped by 1911

Both

 

2

N/A

1902

Freight

Withdrawn/Scrapped by 1911

Both

 

3

N/A

1902

Freight

Withdrawn/Scrapped by 1911

Both

 

4

St Tudno

1902

Passenger

In Service

Lower

5

St Silio

1902

Passenger

In Service

Lower

6

St Seiriol

1902

Passenger

In Service

Upper

7

St Trillo

1902

Passenger

In Service

Upper

 
I'd recommend a trip to the Great Orme Tramway, it is well worth the trip for the stunning views and the chance to travel on the beautifully restored tramcars!  More photos can be found at: https://scottishtrains.zenfolio.com/p617134255

Comments

No comments posted.
Loading...

Most of my Photographs and sightings are from my favourite locations in the Lanarkshire area, including

  • Carstairs
  • Float Viaduct
  • Abington
  • Cartland
  • Hartwood
  • Greenfaulds
  • Holytown
  • Coatbridge Central
  • Auchengray
  • Carluke
Subscribe
RSS
Archive
January February March (4) April (8) May (2) June (4) July (4) August September October November December
January February March April May June July August September October November December
January February March April (57) May June July (30) August September October November December
January February March April (89) May (3) June (13) July August September October November December
January February March April May June July August September October November December
January February March April May June July (19) August September October November December
January (1) February March April May (1) June (1) July (3) August September October (13) November December (2)
January February March (4) April (5) May (3) June July August (13) September October November December (1)